Newman Development Group, LLC
Location
Binghamton, New York
Mixed Use Building and Underground Parking Garage
Keystone performed the Geotechnical Engineering Evaluation for the site, which included a subsurface investigation consisting of borings and a written geotechnical report for the design and construction of the new building. Special inspections and material testing were also provided for soil, concrete, and masonry construction.